CN Rail Cisco Bridge – Repair Connecting Angle
About The Project
Tatras Industrial successfully installed a Horizontal Lifeline (HLL) system on the CN Rail
Cisco Bridge, signicantly improving safety infrastructure for ongoing maintenance and
operations. The project included welding posts into place and installing HLL cables, with all critical components carefully assembled and installed. Each connection was thoroughly
inspected to ensure structural integrity and safety. To further enhance stability and load
distribution, tieback systems were also integrated. Our technicians utilized advanced rope access techniques to complete the installation efficiently, minimizing disruption to bridge operations while maintaining the highest safety standards.
Project Details
Date:
2024
Location:
Lytton, BC